FREEDOM DIANETICS
  • Home
  • R3R-FS Dianetics Procedure
  • Dianetics Timeline
  • Outline of Integrated Dianetics Bridge
  • Standard Dianetics

Outline of Integrated Dianetics Bridge

This is a suggested sequence of Dianetics auditing actions and rundowns, from the beginning to the end of a Dianetics bridge.

This is "Column D" of the FreeScientology bridge.

It is in outline form, taken from an upcoming book and coursepack for New Integrated Dianetics [NID]

This will integrate Standard Dianetics (1969), Expanded Dianetics (1972) and New Era Dianetics (1978) all the way to FreeScientology OT8.

This can meanwhile be used as a guide for auditing actions in Dianetics that parallel the Scientology Grade Chart for optimum case progress.

  • UNMETERED, BEGINNING DIANETICS
  • 1.  Basic Study Materials
  • 2.  The Dianetics Seminar - Auditing Commands
  • 3.  HCOB Dianetics 1966
  • 4.  TIR Seminars & Procedure
  • 5.  R3R-FS & Moment of Shock
  • 6.  FreeScientology Auditor Level 0 Course

  • STANDARD DIANETICS
    7.  Dianetics Today (1975) & Clearbird Self-Training
    8.  Dianetics C/S-1 (NED 21) & Word-Clearing
    9.  C/S Series 54 
    10. (OAS) Original Assessment Sheet (NED ) & Health Form
    11. Illness-Injury Checklist Program & Training
    12. Assessment Lists & Interviews for Running Items (FreeScn, RonsOrg) 
    (XDN 27, 27-1, 27-2 - Dynamic Sort-Out Assessment)

  • The NEW INTEGRATED DIANETICS GRADE CHART

    SPECIAL CASE CHALLENGES
    13. Special Case Challenges - Stuck Points on the Track - XDN 33 

    (XDN 24 - SPs) + C/S Series 54 (OAS - ELECTRIC SHOCK/PLANT) + Clay Table Auditing
    14. Drug-Alcohol-Medicine Handlings - Possible Programs
    15. Special Case Challenges - Suppression & PTS Rundown (XDN 23)
    16. Special Case Challenges -
    Introspection Remedy & Rundown (HCOB 23 Jan 74RB)
    17. Special Case Challenges - Past Auditing - XDN 30 + NED 31
    18. Picture & Masses Remedy - NED 24

  • MASTERING STANDARD DIANETICS
    19. Expanded Dianetics Lecture #1 - 1972
    20. Left-to-Right OCA Handling & Layout of Grade Chart
    21. Integrating ALL of Dianetics (coordinating approaches)

  • PREPARING FOR PROFESSIONAL DELIVERY
    22. Objectives & Drug Rundowns - NED 9RC
    23.
    L3RH Correction List - NED 20 - Expanded Dianetics Repair List - L3 EXD - XDN 2
    24. C/Sing Dianetics: 
    C/S-54 (NED 8RA), OAS Interviews (NED 5RA, NED 12R), Narratives & Preassessments
    Illness & Injury Checklists, XDN Left-Side, LX Lists, Dynamic Sort-Out Assessment

  • ENVIRONMENT & EMOTIONAL STRESS HANDLINGS

  • (OAS = Original Assessment Sheet)

  • OAS - DANGERS
    25. Present Time Environment R/D - XDN 28

    OAS - LOSSES & DEATHS & UPSETS
    26. Relief R/D - NED 10R
    ---L3RH R/D---
    27. Emotional Stresses R/D - XDN 29
    28. LX Lists R/D (XDN 29)
  • * this is a good point to do Scientology Introductory Auditing (Life Repair) and/or Mini-Grades *

  • OAS - ILLNESSES, ACCIDENTS, OPERATIONS, FAMILY INSANITY, 
    PREVIOUS DIANETIC OR SCIENTOLOGY PROCESSING

    29. Narrative NED or R3R-FS (XDN 30 - Past Auditing & Expanded Dianetics)

    OAS - PERCEPTION DIFFICULTIES, COMPULSIONS, REPRESSIONS, FEARS, FORMER PRACTICE, 
    PROBLEMS YOU'RE TRYING TO SOLVE WITH PROCESSING, DONE SOMETHING HARMFUL 

    30. Preassessment for NED or R3R-FS

  • ---this ends phase I of Expanded Dianetics Left-Side OCA auditing---
  • (any middle bridge or re-tread bridge Dianetics program should start back at step 26 and come forward)

  • OAS - LOOK ON YOURSELF AS SOMEONE ELSE
    31. Identity R/D - NED 15

    32. Disability R/D - NED 14 - (and/or Postulate Processing - L. Kin)

    33. Wants Handled R/D - XDN 32
    (1st approach 1-5) (Past Life Remedy, if needed)

    34. Dianetic Student Rescue Intensive - NED 11

    35. Dianetic Prepared Assessment Rundown - NED 13

    36. Dynamic Sort-Out Assessment
    (HCOB 2 Sep 74) (+ R1C Dynamic Assessments)

  • * here is a good point to do Mini-Grades or Expanded Grades if not already done, and to run the following Dianetics actions given here after each Grade is completed:

  • GRADE 0 DIANETICS
    37. (Fear of) People List R/D (HCOB 15 NOV 73RA)
    38. Vital Information R/D (HCOB 6 OCT 74RA)

    GRADE I DIANETICS
    39. Problems You're Trying to Solve With Processing (C/S Series 54 - OAS)

    GRADE II DIANETICS
    40. Perception Difficulties (C/S Series 54 - OAS)
    41. Done Something Harmful (C/S Series 54 - OAS)

    GRADE III DIANETICS
    42. Introspection R/D (HCOB 23 JAN 74RB)
    43. ARCU R/D (Expanded Dianetics Lecture #1)

    GRADE IV DIANETICS
    44. R3RA Service Facsimile Handling - NED 30
    45. Hidden Standard - XDN 31
    46. Service Facsimile Theory & Expanded Dianetics - XDN 20
    47. Expanded Dianetics Service Facsimile Handling - XDN 36 
    48. L3RH R/D---(end middle Dianetics bridge)---


  • ADVANCED EXPANDED DIANETICS (RIGHT-SIDE OCA)
    49. Wants Handled R/D - XDN 32
    (2nd approach A-E)
    50. Handling Stuck Points on the Track - XDN 33 - Power and/or Postulate Processing (L. Kin)
    51. FPRD Confessionals + L10 Lists + Dynamic Confessionals - XDN 34
    52. Responsibility R/D - XDN 35
    53. Metalosis R/D - XDN 37
    + FreeScn Heavy Metals List
    54. OCA R/D - XDN 38
    55. R3R OT R/D
    - and/or Postulate Processing (L. Kin)
    56. OT8 DIANETICS R/D (+ Postulate Processing Solo) + L11, L10, L12 (solo)


Site powered by Weebly. Managed by Hostmonster
  • Home
  • R3R-FS Dianetics Procedure
  • Dianetics Timeline
  • Outline of Integrated Dianetics Bridge
  • Standard Dianetics